Equipment must not simply be installed. Systems are inspected, tested, verified, and prepared for operational handover — and the client accepts the plant on the records we produce.
- Pre-commissioning inspections
- Equipment verification
- Electrical testing
- Protection-system testing
- Generator testing
- Transformer testing
- Control-system verification
- Generator synchronization
- Load testing
- Integrated-system testing
- Performance verification
- Deficiency correction
- Client acceptance
- Final handover