Scope. Two 2.5 MVA standby generator packages with fuel systems, controls integration, and connection into the existing distribution — delivered for a confidential data-center operator.
Delivery. Equipment was procured through qualified manufacturers and factory-tested before shipment. Installation and switchover work were carried out around live operations, in agreed maintenance windows.
Outcome. Both sets were load-tested against the facility's real load profile, integrated with the building's monitoring, and handed over with complete commissioning records.